API Migration Guard Run free scan

Migration assurance

listTransactions 180-day window: migration guide and scanner checklist

listTransactions 180-day window explains what replaces Finances date ranges over 180 days, the removal date, the migration risks to validate, and how API Migration Guard detects the pattern.

TL;DR

Deprecated itemRemoval dateReplacementMigration riskScanner detection
Finances date ranges over 180 daysAugust 27, 2027Chunked listTransactions windows of 180 days or fewerA too-large range can return empty results and hide missing financial data.AMZ-FIN-WINDOW-001

Official status

Amazon documentation lists Finances date ranges over 180 days as in-scope for this migration. Use the official source before code freeze because deadlines and replacement details can change.

Production Finances validation plan

Finances migration must protect accounting completeness. The validator evidence should be paired with a manifest that proves windows, nextToken pagination, recursive breakdowns and expected totals for representative close periods.

Validation areaProduction proof to collect
Date windowsSplit requests into 180-day-or-smaller UTC windows and record the generated ranges.
PaginationContinue on empty pages when nextToken exists and preserve postedAfter/postedBefore on every token request.
BreakdownsReconcile recursive amounts with deterministic decimals instead of floats.
IdentifiersValidate order, settlement and transaction identifiers against expected ledger joins.

UTC window split with replay overlap

The safest 180-day migration is deterministic: split in UTC, keep the end boundary exclusive, and replay a small overlap during validation so boundary transactions can be deduplicated by transactionId instead of silently dropped.

StepRule
NormalizeConvert postedAfter and postedBefore to UTC instants before splitting.
SplitEmit windows of 180 days or fewer, using [start, end) semantics.
Overlap validationReplay a 5-minute overlap in the test manifest and deduplicate by transactionId.
Recent-data guardKeep postedBefore more than two minutes before request time for production jobs.
function* splitInto180DayWindows(startUtc, endUtc) {
  let cursor = startUtc;
  while (cursor < endUtc) {
    const next = min(addDays(cursor, 180), endUtc);
    yield { postedAfter: cursor.toISOString(), postedBefore: next.toISOString() };
    cursor = next;
  }
}
// Validation run: replay a 5-minute overlap and dedupe by transactionId.

Removed resource and replacement

Old resourceReplacementDeadlineValidation outcome
Finances date ranges over 180 daysChunked listTransactions windows of 180 days or fewerAugust 27, 2027A too-large range can return empty results and hide missing financial data.

What breaks

AreaBreakage
Code patternFinances v0 event-list call or endpoint usage for Finances date ranges over 180 days.
Payload or schemalistTransactions uses transaction objects, recursive breakdowns and Currency object amounts.
Permission or data accessRecent data and date-window behavior need operational validation before financial close.
Pagination, status or field mappingWindows over 180 days can return empty results; nextToken pages must preserve the original arguments.

Before/after example

The example is intentionally small so the migration shape is visible in a code review.

Before:
await listTransactions({ postedAfter: '2026-01-01T00:00:00Z', postedBefore: '2026-12-31T00:00:00Z' });

After:
for (const window of splitInto180DayWindows(start, end)) await listTransactions(window);

Scanner detection

Rule IDSeverityEvidence patternFalse positive conditionValidation step
AMZ-FIN-WINDOW-001BLOCKER or HIGH depending on source evidenceFinances date ranges over 180 daysDocumentation, comments, generated clients or test fixtures can require manual review.Replace the v0 financial-event call with listTransactions and preserve request arguments on token pages.

Migration checklist

Common mistakes

Sample report preview

The public sample report shows the same evidence shape used by paid reports: rule ID, severity, file location, redacted evidence, migration mapping, validation step and quality gate.

FAQ

What replaces listTransactions 180-day window?

Chunked listTransactions windows of 180 days or fewer

Why does the 180-day window matter?

Amazon can return an empty response when the postedAfter..postedBefore range is more than 180 days.

Can a sample prove every finance total?

No. It proves the supplied pages and manifest reconcile within tested scope; production close still needs staged validation.

Official sources

Internal migration links

Validate listTransactions 180-day window in your source

Run a static scan, review the sample report shape, then unlock the detailed migration report when the evidence is useful.

Recommended next action